Fujian Zhangzhou Settlement Build

Fujian Zhangzhou Settlement Build

High efficiency energy-saving PMS passenger elevator is adopted for the elevator procurement and installation project of Yunxiao County Louzijiao area housing transformation. Its rated capacity is 800kg. Speed is 1.0m/s,12/12/12. The elevator has capacity of 10 persons. It is in the way of center opening. Cabin specification is 1400mm× 1350mm. Cabin door material adopts hairline stainless steel. Sill is made of rigid aluminum alloy.